LocalMovers.com Company Logotype

Mobile home moving laws and licensing in Arizona

Researched from public sources, last checked March 14, 2026. Not yet verified by our team: confirm with the agency before relying on it.

Is a license required?

Arizona regulates mobile-home work through installer licensing. We have no license on record specific to moving a mobile home. The primary regulator is AZ Dept. of Housing, Office of Manufactured Housing.

Mobile home licenses in Arizona

Installing (not a moving license)

USDOT and operating authority

  • A USDOT number is required for moves within Arizona when the vehicle or combination weighs 26,001 lbs or more. Source
  • Moves that cross a state line need a USDOT number in every state. Source

Licensed mobile home movers in Arizona

10 companies in our records hold a Arizona credential for mobile home work. Browse mobile home movers in Arizona.

Questions

Do you need a license to move a mobile home in Arizona?
Arizona regulates mobile-home work through installer licensing. We have no license on record specific to moving a mobile home. The primary regulator is AZ Dept. of Housing, Office of Manufactured Housing.
Does a mobile home mover in Arizona need a USDOT number?
A USDOT number is required for moves within Arizona when the vehicle or combination weighs 26,001 lbs or more. Moves that cross a state line need a USDOT number in every state.

Sources